7 contractors participated in implementing Tan Van intersection on Ring Road 3 of Ho Chi Minh City

--

Tan Van intersection is considered by contractors to be the most difficult to implement on Ring Road 3 – section through Binh Duong.

This intersection belongs to package XL1, worth 1,831 billion VND, constructed by 7 joint venture enterprises, including: Deo Ca Group Joint Stock Company; Deo Ca Construction Joint Stock Company; Delta Commercial Construction Joint Stock Company; North Central South Infrastructure Construction Joint Stock Company; Construction and Investment Joint Stock Company 492; Hai Dang Joint Stock Company; Vietnam Construction and Import-Export Joint Stock Corporation.

Tan Van intersection connecting the gateway of Binh Duong province with Hanoi Highway (HCMC) was officially started construction by Binh Duong province on April 22.

Tan Van intersection is an intersection connecting the complex traffic gateway of Di An City, Binh Duong province with Ho Chi Minh City. This package has a total length of 2.4 km, and the contract implementation period is 1,050 days.

7 contractors participate in implementing Tan Van intersection on Ring Road 3 of Ho Chi Minh City - Photo 3.

Once completed, Tan Van intersection will relieve traffic pressure, promoting socio-economic development for localities in the Southeast region.

Once completed, this intersection will open bottlenecks connecting trade in all directions with the provinces and cities of the Southeast, promoting the economic and social development of the region, opening up new opportunities for transportation. investment and business development.

Ho Chi Minh City Ring Road 3 project passing through Binh Duong has a total length of about 26.6 km; Of which the Tan Van intersection is 2.4 km long, the Binh Chuan – Saigon River section is 8.9 km long, and the section coinciding with My Phuoc – Tan Van road is 15.3 km long. The expected total investment is 190,280 billion VND, going through 3 localities (Thu Dau Mot, Di An and Thuan An cities), with a total compensation cost of over 13,063 billion VND.

In 2024 alone, the section passing through Binh Duong will be allocated investment capital for component projects of 3,834.8 billion VND.

The article is in Vietnamese

Tags: contractors participated implementing Tan Van intersection Ring Road Chi Minh City

-

NEXT Tourists braved the danger of checking in to ‘welcome fierce waves’ nearly 10 meters high at Nam Dinh beach