Rest stops on the Northern Expressway

Rest stops on the Northern Expressway
Rest stops on the Northern Expressway
--

Xuan Khiem rest stop at Km269, Ninh Binh province

To serve the essential needs of people while waiting for the rest stops to complete their investment and put them into operation, the Ministry of Transport has Direct agencies and units to deploy the telegram No. 36 dated April 11, 2024 of of the Prime Minister on organizing temporary rest stops along the North-South Expressway in the East, which has no rest stops.

The Ministry of Transport said that up to now, the Project Management Boards have actively and urgently implemented the project and are ready to serve the people.

Specifically, for the section from Phap Van to Cao Bo highway, there are 2 rest stops in operation by VEC and Xuan Khiem (VEC station Km227+000 in Ha Nam province and Xuan Khiem station Km269 in Ninh Binh province).

From Xuan Khiem Station to National Highway 46B arranged 3 temporary rest stop locations on Mai Son – National Highway 45 section (Km329+700); Nghi Son – Dien Chau section at Truong Vinh tunnel entrance (Km386+360); Dien Chau – Bai Vot section at Than Vu tunnel entrance (Km438) (each location has stations on the left and right of the route).

Thus, from Hanoi to Vinh (Nghe An), with a length of about 280 km, there are 5 rest stops (2 stations currently operated by investors and 3 temporary stations). with average distance Every 50-60 km, arrange a rest stop/temporary station to ensure the stopping needs of vehicles participating in traffic on the route.

For the section from Nha Trang (Khanh Hoa province) to Ho Chi Minh City, arrange 3 temporary rest stop locations on the sections. Nha Trang – Cam Lam at Km33; Cam Lam – Vinh Hao section at Km113; Vinh Hao – Phan Thiet section at Km199 on the left of the route and 1 expressway entry/exit point at DT765 intersection on Phan Thiet – Dau Giay highway to go to Dai Phu rest stop.

TFrom Ho Chi Minh City – Nha Trang, 2 temporary stops will be arranged on each section Cam Lam – Vinh Hao at Km113; Nha Trang – Cam Lam section at Km33 and Highway entry/exit indication point at intersection DT765 on Phan Thiet – Dau Giay highway Go to Dai Phu rest stop and Ma Lam intersection Km208+700 on Vinh Hao – Phan Thiet highway to Hien Huong rest stop.

Thus, from Nha Trang to Ho Chi Minh City, with a length of about 400 km, there are 5 rest stops/guide intersections (1 station that VEC investors are operating at Km41+100 on the HCM – Long Thanh – Dau Giay route, 3 Temporary stations and expressway entry/exit indications) with At an average distance of 70-80 km, arrange a rest stop/temporary station Ensure rest stops for vehicles participating in traffic on the route.

In addition, the Ministry of Transport provides and lists the locations of rest stops and gas stations on roads connecting to highways through intersections so that vehicles know and can use them temporarily in the near future.

For the Cam Lo – La Son route connecting Quang Tri with Thua Thien – Hue with a length of about 98.3 km, temporary stops are currently arranged at Km64+200 off the route (area of ​​3,600 m2) and Km77+ 800 right of way (area 4,200 m2) guaranteed Ensuring stops for vehicles participating in traffic on the route.

The Ministry of Transport said that for 8 rest stops on the North-South Eastern Expressway in the 2017-2020 period, including: Mai Son – National Highway 45; Nghi Son – Dien Chau; Dien Chau – Bai Vot; Nha Trang – Cam Lam; Cam Lam – Vinh Hao; Vinh Hao – Phan Thiet (2 stations); Phan Thiet – Dau Giay, has now released bidding documents.

Project Management Boards will open bids on May 20, and are expected to select investors in June 2024.

When an investor wins the bid, negotiations will be conducted to have construction measures and plans to arrange temporary works to serve traffic participants in the shortest time (maximum 2-3 months) to ensure the The component projects mentioned above that have opened to traffic all have temporary stops to serve people.

The article is in Vietnamese

Tags: Rest stops Northern Expressway

-

PREV 9 groups of people received pension increases after the July 1 salary reform
NEXT Dak Lak has not reported on bidding packages related to Cong Minh Company