Hypothetical situation at 5:23 April, storm No. 30 made landfall in the mainland and Quang Binh province, the center of the storm passed through Dong Hoi city, reaching level 15. The storm caused great damage, including Dong Hoi Electricity The power grid suffered the heaviest damage.
PC Quang Binh urgently organized a meeting of the Steering Committee for Natural Disaster Prevention and Control to immediately deploy a plan to overcome damage after the storm. By 12 o’clock on the same day, the entire power grid in Dong Hoi City area was inspected and power supply was restored to areas with technical assurance (photo above).
To promptly fix problems after the storm and quickly restore power supply to customers, PC Quang Binh mobilized shock forces at units to support Dong Hoi Electricity in restoring the power grid after the storm. at Dong Hoi Northwest Industrial Park.
At the scene, PC Quang Binh also organized a synthetic resurrection drill on dolls with 10 competing teams (image). After 4 hours from the issuance of the drill order, the 2024 drill took place and was completed according to plan, performed with absolute safety.